Live — free, no sign-up
Would your DeCA pass a roadside inspection? Check it now
Paste the document's public URL or upload its PDF and we run the same technical checks the regulation demands, with the result explained check by check. Free, no account needed.
Your document is analysed on the fly and never stored.
Validate your document
The starting point is the same an inspector would have: your document exactly as it travels in the truck.
Privacy commitment: the document is analysed to produce the result andis never stored. Sources: DGTCF resolution of 5 June 2026 (BOE-A-2026-12784) and Art. 6 of Order FOM/2861/2012 — full context underwhat the DeCA is.
What is verified, check by check
The resolution of 5 June 2026 sets specific technical requirements for a DeCA to be valid. Here they are, translated from the official gazette into plain English:
Maximum size: 5 MB
Creation and modification metadata
Embedded QR pointing to the document URL
Unique HTTPS URL with direct download
URL valid for the whole service
Complete mandatory data (Art. 6)
Generated before the service starts
Issue documents that already pass these checks
The validator is our own compliance engine: every DeCA issued on the platform is validated against these checks before activation.
Validation before activation
Verified by automated tests
Try it for free
Frequently asked questions about the validator
What exactly does the validator check?
Do you store the documents I upload?
Why do I get a warning on the QR URL check?
What if my document fails the checks?
And the fines? What is at stake if my document is not compliant?
89daysuntil 5 October 2026
Inspections don't give notice
Every document issued on the platform already passes these checks. Start with 10 free.